The Eastmain-1 Hydroelectric project was carried out by a joint venture between Aecon and HT Civil Canada Inc (Hochtief Construction A.G.). The project involved the construction of the powerhouse, the water intake structure and horizon penstocks.

The surface powerhouse was built into a rocky hill on the left bank of the Eastmain River and is comprised of three vertical-axis generating units. The water intake structure is equipped with three gates and each opening has a track to prevent infiltration of debris into the penstocks. The penstocks themselves are conduits excavated in the rock and are lined with concrete.

CLIENT
Société d’énergie de la Baie James

START DATE
2002

COMPLETION
2007

62K
M3 OF CONCRETE

3.9M
KG OF REINFORCING STEEL

Eastmain-1 Hydroelectric

Other Project

Autoroute 30 Highway

Autoroute 30

Montreal, Quebec

Montreal’s Autoroute 30 (A-30) project was one of the most important transport infrastructure projects undertaken in Quebec in the past 50 years.

View Project