Aecon has teamed up with Graham Infrastructure to rehabilitate the Annacis Island Wastewater Treatment Plant. Aecon is working on critical upgrades that will allow the plant to meet the needs of a growing population in Metro Vancouver, strengthen its
ability to operate in the event of an earthquake, and adapt to climate change. The team will ultimately pour 58,000 m3 of concrete, weld out 61,000 diameter inches of process piping and complete over 200 plant tie-ins with the aid of the innovative
BIM 3D modelling system.