Aecon is supporting the transition of the Building 226-F Facility to the Savannah River Plutonium Processing Facility by demolition and removal of all components including equipment and bulk commodities while protecting the existing structure. Aecon is also responsible for the design, installation and maintenance of temporary HVAC infrastructure.